


Now
the drum room is taking shape with the floor going down and
the timber cladding being added.

The
control room window and doorway into bar area

and
visa versa, the view from the control room.

The
vocal booth is getting lined and it's raised floor is added

The
raised floor at the rear of the control room.

and
the slot resonator on the rear wall of the control room is
getting painted

as
are the slots in the drum room

...........
Paul
the builder and Mal the electrician............................Cutting
the ducts in the concrete
More
to come when Kev sends me the pics
Cheers
John 