Home

Snapper's Studio

Here is a shot of one of the completed control room windows. You can see the black cloth that separates the gap bewteen the two walls and two pieces of glass. Well done Bryant!



Bryant is devising a plan for the glass block panels that are going into the rear wall. Once finished they will be hinged to allow access to another set of windows that can be opened in the summer time. They also allow for some natural sunlight to pass into the room.



Here you can see the outside basement windows back up in the wall. Bryant is starting to frame the opening for the next windows.



Final layer of drywall being hung on channel.



The back wall with cold air return.



A little drywall left to do.



The front wall after first pass with tape and mud.What fun!



Here is a shot of the glass block panels installed on the rear wall. It was a little tricky getting these buggers in. They will each have a light fixture behind them to add some dramatic lighting to the room.



Next update will be the finished product.Just a few days left.

Cheers Mike

 

 

 

Webmaster - johnsay