OK So now we have almost completed all the main framing. The booths are almost completed and the Insulco (black) is now in the wall cavities and the hangers are in the ceilings with the cloth panels made up ready to be covered.

......

 

The control room is nearing completion of the basic structures and the Insulco is placed in the wall cavities.

You can see the hangers in the corner traps and the window sections are ready for the Jams to go in. Above is a view looking from the Piano Studio into the control room. The front of the control room is now waiting for the speaker enclosures to go in. This is a view looking into the Piano Studio from the control room. Mark is in the kitchen/recreation room area and the black insulco is in the wall cavities in the piano room. The double cavity door frames are now in the piano room.

The 2" (50mm) Insulco looks like this. It has a black facing on one side.

The piano room is now nearing completion and waiting for the joinery work to fully complete the wall treatment.

Looking from the front door through the kitchen/recreation area into the piano studio. This is my best Mate Mr Zig my Red Kelpie dog. (he hates having his photo taken)

.......

The kitchen/Recreation area has a false ceiling lined with dacron and will have a cloth finish. Here Greg and Graham are fitting the 2" x 1" frames for the cloth finish.

 

..........

 

So we are getting there at last, the speaker enclosures are now being built and the front verandah area has been cleared (My those Bobcats are a great invention) We will have a 9m x 4m (36' x 13') verandah out the front so we can play table tennis!

I've finally got a picture of Armirel with the boys. He's the one with the hat