Click
to see basic plan..
If
you missed update 3
check it out first.
OK
So now we have almost completed all the main framing. The booths
are almost completed and the Insulco (black) is now in the wall
cavities and the hangers are in the ceilings with the cloth
panels made up ready to be covered.
......
The
control room is nearing completion of the basic structures and
the Insulco is placed in the wall cavities.

You
can see the hangers in the corner traps and the window sections
are ready for the Jams to go in. Above is a view looking from
the Piano Studio into the control room. The front of the control
room is now waiting for the speaker enclosures to go in. This
is a view looking into the Piano Studio from the control room.
Mark is in the kitchen/recreation room area and the black insulco
is in the wall cavities in the piano room. The double cavity
door frames are now in the piano room.

The
2" (50mm) Insulco looks like this. It has a black facing
on one side.

The
piano room is now nearing completion and waiting for the joinery
work to fully complete the wall treatment.

Looking
from the front door through the kitchen/recreation area into
the piano studio. This is my best Mate Mr Zig my Red Kelpie
dog. (he hates having his photo taken)
.......
The
kitchen/Recreation area has a false ceiling lined with dacron
and will have a cloth finish. Here Greg and Graham are fitting
the 2" x 1" frames for the cloth finish.
..........
So
we are getting there at last, the speaker enclosures are now
being built and the front verandah area has been cleared (My
those Bobcats are a great invention) We will have a 9m x 4m
(36' x 13') verandah out the front so we can play table tennis!
I've
finally got a picture of Armirel with the boys. He's the one
with the hat

More
to Come!!
Cheers
John 