UPDATE 5

Click to see basic plan..

If you missed update 4 check it out first.

We have been tied up with additional things such as building a verandah extension to the front of the building. We needed to do this to protect the new Tasmaian Oak floor we have just put down from the weather. We had a bit of rain for a couple of weeks. The verandah is 9m x 4m (36' x 13')

 

 

OK, so the first of the slots has been built. These are timber slats of sizes 35mm, 45mm, 55mm with varying gaps due to the gradual increase in the angle (1 degree) They have a cream cloth backing made from Hemp Cloth and are built over the 75mm (3') cavity in the wall.

........

We have also started adding them to the control room

........

You can see we now have a new floor. It's Tasmanian Oak hardwood sitting in battens on rubber with insulation in the cavity to stop resonance. This is a shot of the rear of the control room.

 

......

The speaker mounts have been put in place. Here is Amirel in front of the speaker soffit mounting.

 

More to Come!!

Cheers John

 

 

 