Progress, ppl. Progress!!

Finally, the plan is set in motion. We just kinda finished phase 1 of this monster: clearing out the studio RC and rec.room annex rehearsal room on the floor 2 and cleaning out the other 2 floors to create space.

We threw away almost anything we haven't used for the last couple 'o months. Major clean-up!

Next up phase 2: demolition!
But first....

PIX to backup my words
Here's a before and after picture (the before pic was shot a few months agon) of floor 2, the now empty RC and finally the garbage we collected.


Attachments:
20060605_00 BuildingFloor2-Studio.jpg
20060605_00 BuildingFloor2-Studio.jpg [ 75.65 KiB | Viewed 3319 times ]
20070517_00 Fase1 Uitruiming.jpg
20070517_00 Fase1 Uitruiming.jpg [ 46.2 KiB | Viewed 3318 times ]
20070517_02 Fase1 Uitruiming.jpg
20070517_02 Fase1 Uitruiming.jpg [ 75.45 KiB | Viewed 3319 times ]
20070517_06 Fase1 Uitruiming.jpg
20070517_06 Fase1 Uitruiming.jpg [ 74.08 KiB | Viewed 3319 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Tue May 29, 2007 1:26 am 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
Right...

Phase 2: Demotime!
As the title states, it's demolition time. Floor 2 will be totally cleared. This is where a rehearsal space annex tracking room and CR was located. As the following pix will show.
We've removed the CR, some GB, ceiling, wood in front of windows and some misc stuff. Next up, the existing (floating) floor and rest of inner walls. Now, who's gonna clean up after me.... Darn, it always amazes me how much Garbage I end up...

Pix:
- 7: removing existing GB
- 6: some junk
- 8 + 9: There's light on the other side. The wood that holds the windows is totally rotten and will be closed with clay bricks.
- 12+13: The wall between TR and CR is down, baby!


Attachments:
20070528_07 Fase2 Sloop (2e etage).jpg
20070528_07 Fase2 Sloop (2e etage).jpg [ 59.88 KiB | Viewed 3226 times ]
20070528_06 Fase2 Sloop (2e etage).jpg
20070528_06 Fase2 Sloop (2e etage).jpg [ 70.54 KiB | Viewed 3226 times ]
20070528_08 Fase2 Sloop (2e etage).jpg
20070528_08 Fase2 Sloop (2e etage).jpg [ 46.62 KiB | Viewed 3226 times ]
20070528_09 Fase2 Sloop (2e etage).jpg
20070528_09 Fase2 Sloop (2e etage).jpg [ 62.78 KiB | Viewed 3224 times ]
20070528_12 Fase2 Sloop (2e etage).jpg
20070528_12 Fase2 Sloop (2e etage).jpg [ 54.36 KiB | Viewed 3222 times ]
20070528_13 Fase2 Sloop (2e etage).jpg
20070528_13 Fase2 Sloop (2e etage).jpg [ 64.49 KiB | Viewed 3225 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Sun Jun 03, 2007 1:42 am 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
Demolition day 2
Last week we started with demolition of the 2nd floor, today we continued. Goals for today where to clean up the mess from last week (shipping wood, insulation and other stuff to the junkyard), break some more walls/ceilings and clean up a bit.

Some pix for proof:
1. Some more demo
2. The remaining junk from last week's demo
3. Moving that junk by car, to the dump...
4. Clean up
5. We're getting closer, junk's mostly gone and all walls and ceiling being stripped.

Next week, demolition of existing gypsumblock walls and shipping them to the dump.

cheers.


Attachments:
20070602_00 Fase2 Sloop (2e etage).jpg
20070602_00 Fase2 Sloop (2e etage).jpg [ 50.59 KiB | Viewed 3157 times ]
20070602_01 Fase2 Sloop (2e etage).jpg
20070602_01 Fase2 Sloop (2e etage).jpg [ 63.23 KiB | Viewed 3156 times ]
20070602_04 Fase2 Sloop (2e etage).jpg
20070602_04 Fase2 Sloop (2e etage).jpg [ 102.92 KiB | Viewed 3156 times ]
20070602_05 Fase2 Sloop (2e etage).jpg
20070602_05 Fase2 Sloop (2e etage).jpg [ 61.84 KiB | Viewed 3154 times ]
20070602_06 Fase2 Sloop (2e etage).jpg
20070602_06 Fase2 Sloop (2e etage).jpg [ 62.88 KiB | Viewed 3154 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Mon Jun 11, 2007 4:42 pm 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
Another fine little demo
Day 3

Pfew, it's summertime in the Netherlands which makes demolition a pretty swetty job. It's about 27 degrees celcius here, and we're demoing the top floor with flat roof.... Imagen the heat inside :shock:

Ahwell, we cleaned up the place from last time and started removing the first portion of the existing inner wall which was made 15 years ago. It's made of Cellular concrete with a cavity filled with mattras foam (!)

We only managed to break down eastern wall (left on the first picture)
Next friday we'll remove all the this garbage (to the junkyard) and start breaking down the south and west walls.

Also removed the "studio" control-room floating floor.

Here's proof:

1 - Photo taken at entrance level (north), at the left is the, now, removed wall. The middle is the garbage from that.
2 - Same, Same but different (angle) ;)
3 - The Cellular concrete residu
4 - This is what was used for insulation in air cavity
5 - Shot from the back (south)


Attachments:
20070609_00 Fase2 Sloop (2e etage).jpg
20070609_00 Fase2 Sloop (2e etage).jpg [ 59.93 KiB | Viewed 3068 times ]
20070609_01 Fase2 Sloop (2e etage).jpg
20070609_01 Fase2 Sloop (2e etage).jpg [ 65.49 KiB | Viewed 3065 times ]
20070609_02 Fase2 Sloop (2e etage).jpg
20070609_02 Fase2 Sloop (2e etage).jpg [ 75.73 KiB | Viewed 3063 times ]
20070609_03 Fase2 Sloop (2e etage).jpg
20070609_03 Fase2 Sloop (2e etage).jpg [ 65.83 KiB | Viewed 3063 times ]
20070609_06 Fase2 Sloop (2e etage).jpg
20070609_06 Fase2 Sloop (2e etage).jpg [ 56.02 KiB | Viewed 3065 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Sat Jun 16, 2007 7:38 pm 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
Another Day in hell
Blood, sweat and heavy stuff. We did some more demolition and getting closer to a completely stripped room. Wow, the reverb just keeps on growing here 8)

We stripped the remaining Cellular concrete wall partitions (south and west wall). More garbage, man where does it come from!

Here's again some pix

1 - The yellow foam from in between the exterior wall and, now removed, inner wall. WHAT were those guys thinking when they build that wall (bout 15 years ago) [oh well, I'd prolly do the same back then. .. I too was ignorant
2 - Bringing all the stuff to the garbage disposal
3 - Yup, a disposed wall
4 - Removing some more wood
5 - Now, THAT's what a stripped room looks like

Next friday will prolly be the last run concerning demolition. We've still got to remove the existing "floating" (not really) floor. That floor is nothing more than a raised floor. No spring whatsoever.... man, am I glad I found this forum.

cheers, untill next week
ro


Attachments:
20070615_00 Fase2 Sloop (2e etage).jpg
20070615_00 Fase2 Sloop (2e etage).jpg [ 52.01 KiB | Viewed 3002 times ]
20070615_02 Fase2 Sloop (2e etage).jpg
20070615_02 Fase2 Sloop (2e etage).jpg [ 86.54 KiB | Viewed 3003 times ]
20070615_03 Fase2 Sloop (2e etage).jpg
20070615_03 Fase2 Sloop (2e etage).jpg [ 83.2 KiB | Viewed 3003 times ]
20070615_04 Fase2 Sloop (2e etage).jpg
20070615_04 Fase2 Sloop (2e etage).jpg [ 53.86 KiB | Viewed 3002 times ]
20070615_05 Fase2 Sloop (2e etage).jpg
20070615_05 Fase2 Sloop (2e etage).jpg [ 53.2 KiB | Viewed 3002 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Sun Jun 17, 2007 2:59 am 
Offline
User avatar

Joined: Fri Sep 30, 2005 12:13 am
Posts: 188
Location: Stockholm, Sweden
looks good ro, didn't know you had to demolish to that extent to get things going.. got scared when I saw 20070615_04 Fase2 Sloop (2e etage).jpg and thought you were cutting the "trusses" from beneath. But with a floor on your head there would be no more posting... :shock:

keep up the good work!

a
:arrow:


Top
 Profile  
 
 Post subject:
PostPosted: Sun Jun 17, 2007 8:05 pm 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
Thanx A. Yeah, we had to go the whole nine yards with this one. In order to get things done correctly all previous work (which is more than 15 years old anyway) had to be removed. And boy, am I glad we did.

And hell, it's a great job doing so. Keeps me occupied, haha. cheers, ro


Top
 Profile  
 
 Post subject:
PostPosted: Sat Jun 23, 2007 1:11 am 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
I just came back today... just came back from the storm
Holy crap! The dust I suffered today.. man!

We're close to finish phase 2 of this project: demolition.
(or atleast the demo of the second floor)

First thing we did was clean-up remaining mess from last week. Then we removed 3 (three!) layers of carpet :) and some green tiles which we will prolly re-use when getting the laminated floor done.

One big obstacle has been removed today; the remaining smokechannel. This brickbuild smokechannel was one big dust pool, gheh.
We used a jackhammer and hand tools to remove it. As I expected the whole chimney was build within the existing wall. Well we just jacked it away and there ain't no real damage after all..phew! :D
But the dust... bleh. Ohwell, atleast it's the (hopefuly) LAST pieces of rock we've got to demo (in the entire building).
At the very end (!) of the job, the hammer broke down.. so we had to do the last pieces of bricks by hand. EASY!

What's left is the "floating" (euh..not!) floor. It's a wood frame with wool and some board on top. No big deal. We'll remove the thing next time.

As always; picture time!

1 - Removing carpets
2 - My friend working the jackhammer. Funny detail; the band, in which he is the drummer, is actually called.... Jackhammer!
3 - Damn, it broke!
4 - Ah, the chimney/smokechannel complete removed
5 - This space between us is killing me! (wow, ECHOOOOO hehe)


Attachments:
20070622_00 Fase2 Sloop (2e etage).jpg
20070622_00 Fase2 Sloop (2e etage).jpg [ 52.64 KiB | Viewed 2888 times ]
20070622_01 Fase2 Sloop (2e etage).jpg
20070622_01 Fase2 Sloop (2e etage).jpg [ 53.08 KiB | Viewed 2890 times ]
20070622_04 Fase2 Sloop (2e etage).jpg
20070622_04 Fase2 Sloop (2e etage).jpg [ 66.69 KiB | Viewed 2888 times ]
20070622_08 Fase2 Sloop (2e etage).jpg
20070622_08 Fase2 Sloop (2e etage).jpg [ 53.36 KiB | Viewed 2888 times ]
20070622_09 Fase2 Sloop (2e etage).jpg
20070622_09 Fase2 Sloop (2e etage).jpg [ 56.1 KiB | Viewed 2891 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Sat Jun 23, 2007 6:35 am 
Offline
Moderator
User avatar

Joined: Mon Jan 03, 2005 4:08 pm
Posts: 4215
Location: Sacramento, Northern California, USA
Thanks for the great pictures, Ro! Looks like you've been really busy! I'm getting exhausted just thinking about it! :lol:

--Keith :mrgreen:

_________________
"Converting a garage into living space requires a city permit . . . homeowners insurance won't cover a structure that's been changed without a building permit . . ." --Sacramento Bee, May 27, 2006


Top
 Profile  
 
 Post subject:
PostPosted: Sun Jul 15, 2007 1:31 am 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
Holy Crap, we're done!
Yes, ladies and gents, seems like demolition is somewhat done after all the hard labour we've done today.

So, euh, ro... WHAT have you done then?
well:

* Removed the raised floor which was a pain in the ass since most panels were not only nailed but also glued to the frame... damn, WHAT were they thinking when they build it.. it would fall apart or something? Anyway, it's removed (finally)
* Removed last pieces of wiring, gypsum, and more stuff.
* Removed the last piece of the old chimney
* Removed nails, screws and what not from the wood beams.
* Cleaning the place up
* Drove 2 times with the buss to the junkyard to dump the last stuff.
* Had a beer....


YAY! Feels goot to have a stripped and empty room. Next up: brick close the existing windows on the second floor.

As always, here's proof:


Attachments:
20070714_00 Fase2 Sloop (2e etage).jpg
20070714_00 Fase2 Sloop (2e etage).jpg [ 47.5 KiB | Viewed 2656 times ]
20070714_03 Fase2 Sloop (2e etage).jpg
20070714_03 Fase2 Sloop (2e etage).jpg [ 44.19 KiB | Viewed 2655 times ]
20070714_06 Fase2 Sloop (2e etage).jpg
20070714_06 Fase2 Sloop (2e etage).jpg [ 42.45 KiB | Viewed 2658 times ]
20070714_08 Fase2 Sloop (2e etage).jpg
20070714_08 Fase2 Sloop (2e etage).jpg [ 78.3 KiB | Viewed 2657 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Sun Aug 19, 2007 12:29 am 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
How much for those windows?
Howdy yalll, just back from another fine demo hour (or 2). Remember (skip back in this thread if ya like) the rotten windows on the second floor? No? check picture one....

Well, it was time to get rid of them since a mason contractor will come round to close the whole with bricks. That'll do some serious noise transfer killing. Well, let's not get ahead.
I've also removed some stucco, more on that later.

First, them pix!

1-(old photo from last year). The rotten windows in the second floor which we removed.
2- Hacking away, already half done.
3- The removed windows.... junk!
4- DON! Lotsa light comming in :)
5- From the outside it now looks like this. You can see we removed quit a bit of rotten wood.

Next time, when the gap gets bricked, we will remove the whole wood section.


Attachments:
20060820_10 VerwijderenRamen2eEtage.jpg
20060820_10 VerwijderenRamen2eEtage.jpg [ 63.86 KiB | Viewed 2431 times ]
20070818_02 Fase2 Sloop (2e etage).jpg
20070818_02 Fase2 Sloop (2e etage).jpg [ 49 KiB | Viewed 2431 times ]
20070818_06 Fase2 Sloop (2e etage).jpg
20070818_06 Fase2 Sloop (2e etage).jpg [ 57.78 KiB | Viewed 2433 times ]
20070818_10 Fase2 Sloop (2e etage).jpg
20070818_10 Fase2 Sloop (2e etage).jpg [ 40.56 KiB | Viewed 2431 times ]
20070818_13 Fase2 Sloop (2e etage).jpg
20070818_13 Fase2 Sloop (2e etage).jpg [ 96.75 KiB | Viewed 2432 times ]


Last edited by Ro on Sun Aug 19, 2007 12:37 am, edited 1 time in total.
Top
 Profile  
 
 Post subject:
PostPosted: Sun Aug 19, 2007 12:35 am 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
(continue)

While removing windows (see up :roll: ) I also started removing some old and bad stucco. Lotsa stucco broke loose from the wall already so I decided to hack away some more loose stucco. .... ucha ucha, damn dust!

While hacking away, the bricked wall appeared and with that I noticed some serious cracks in the wall. Yikes!

Check the attached picture.

The wall is a double bricked one, the photo only shows the inner wall. Dunno if there's an air cavity in between (yet) But we'll check that next time when the brickwork is getting done. Anyways... These cracks are not the only one, the whole darn building is full of'm. But these are the biggest.

Any advise from ya lats on how continue with this?


Attachments:
20070818_04 Fase2 Sloop (2e etage).jpg
20070818_04 Fase2 Sloop (2e etage).jpg [ 60.5 KiB | Viewed 2429 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Sun Aug 19, 2007 1:04 am 
Offline
Senior Member
User avatar

Joined: Wed Jun 18, 2003 6:09 pm
Posts: 760
Location: Antwerp/Belgium
:mrgreen:

Damned Ro, you still have lot's to do.

I think you should hire Lou. His organizational talents are amazing.

Just teasing ......
A lot of courage, and energy ....

_________________
Best regards - Eric Desart
My posts are never meant to sell whatever incl. myself, neither direct, nor indirect.


Top
 Profile  
 
 Post subject:
PostPosted: Sun Aug 19, 2007 10:38 am 
Offline
Site Admin
User avatar

Joined: Mon Jan 27, 2003 12:46 pm
Posts: 5254
Location: Australia
Amazing work Ro - I would suspect that cracks like that might be caused by movement in the foundation :shock:

You may have to get someone to look at it.


Top
 Profile  
 
 Post subject:
PostPosted: Tue Mar 18, 2008 9:52 pm 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2052
Location: Netherlands
Little boys...
Howdy!

It's been a while since we seriously got some work done on this project. Two reasons:
- on februari the 1st me and the misses received a healty SON! His name's Daan. It's my first born so you can imagen the things on my mind... what a great day this was.
I added a picture which was taken today, 7 weeks old. ain't it a cool fella :)

- second reason: delay on hiringa masonary contrator (I won't bother you with details). We finally got round to make plans. Next friday the rotten windows on the 2nd floor (scroll back to see what I'm talking about) will be masoned to have it closed completely. let's live in the dark....

There's gonna be around 2400 stoned masoned in which will take 3 experts about one day. Prior to that we'll stud the existing roof and floor underneath. So, untill next week :)


Attachments:
20080318Daan.jpg
20080318Daan.jpg [ 226.27 KiB | Viewed 1730 times ]
Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 196 posts ]  Go to page Previous  1, 2, 3, 4, 5, 6, 7 ... 14  Next

All times are UTC + 10 hours


Who is online

Users browsing this forum: isol8 and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group