I've finally started my studio build after over 2 years of fits & starts. It's a residential house extension from the ground up. I really wanted an original John Sayers design, but it's not intended for commercial use so in the end I couldn't really justify it. This is my own layout based on the rules here & in Rod's book.

Attachment:
StudioPlan3D640.jpg


We finished the foundation blockwork on the weekend and should be ready to pour the slab in the next couple of weeks.

Attachment:
Foundations640.jpg


You do not have the required permissions to view the files attached to this post.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Last edited by adam on Wed Jun 11, 2014 12:30 pm, edited 1 time in total.

Report this post
Top
 Profile  
 
PostPosted: Wed Jan 06, 2010 6:30 pm 
Offline
Senior Member
User avatar

Joined: Sat Mar 29, 2003 12:26 am
Posts: 2073
Location: Netherlands
great work!


Report this post
Top
 Profile  
 
PostPosted: Wed Jan 06, 2010 8:24 pm 
Offline
Moderator

Joined: Sat Aug 25, 2007 10:54 am
Posts: 3750
Location: Exit 4, Alabama
Good to see one come up out of the ground. What are your ideas on the slab? Conduit for cables? Have you considered or are you going to use sand, have individual slab/footers for each compartment?

This is a really big project so I do wish you the best of luck and good weather when you really really need it :)


Brien

_________________
Brien Holcombe
_____________________________________________
Sound: You can't stop it, you can only try to contain it.


Report this post
Top
 Profile  
 
PostPosted: Wed Jan 06, 2010 9:41 pm 
Offline
User avatar

Joined: Fri Jan 13, 2006 11:02 am
Posts: 107
Location: Gold Coast, Australia
Thanks guys, yep even getting this far has been a big project, and we're still a long way from where most people start!

I wanted separate slabs for internal rooms, but the whole area is on reactive clay, and combined with the serious termite threat in my area, it just wasn't feasible. So it's one big slab, separated from the house as you can see in the pic. It's been over-spec'd to 150mm thick (with 450mm internal beams every 3 or metres) to keep the resonant mass down as much as I can afford, and to minimise cracking as I'll be keeping the floor as concrete.

Conduit - I'll run as much of the signal wiring as possible through MAM gaps but yes several under-slab conduit runs will go in.

We already had our bad luck with the weather - serious rain filled up the footings just after they were dug. For a while we had a moat! And the clay at the bottom of the trenches turned into quicksand. I now have first-hand experience that neither moats nor quicksand are as fun in real life as they are in movies.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Report this post
Top
 Profile  
 
PostPosted: Sat Jan 09, 2010 2:56 pm 
Offline

Joined: Sun May 09, 2004 9:25 am
Posts: 134
Location: Southeast US - NC
Adam,

From one lunatic to the other... if there is ANY way to put the majority of your conduits under the slab for your low voltage... DO IT!

I put ALL of my low voltage under the slabs... It's a MUCH better way to go!

Shame you can't justify the isolated slabs.... it really does make one heck of a difference!

I'll be watching you pull this one out of the ground, with great interest!

Good luck!!

_________________
Good stuff ain't cheap and cheap stuff ain't always good.

Studio Build Insanity: DM Mobile/Dark Pines Studios
(A Rod Gervais Designed Room)


Report this post
Top
 Profile  
 
PostPosted: Sun Jan 17, 2010 9:08 am 
Offline
User avatar

Joined: Fri Jan 13, 2006 11:02 am
Posts: 107
Location: Gold Coast, Australia
Wow, Max! Thanks for the encouragement, I've been watching your progress on RO for years! Congrats on getting through it, you did some great work. I'm in a similar situation to you, with a full time day job & music gigs on the side, so progress will be... uh... nice & steady. Though I've got my Dad helping who's usually still bullocking along after I've worn myself out.

Recent progress: I hired a Kanga mini loader last weekend to distribute 20 cubic metres fill (they call it "cracker dust" in these parts). Video of that is here. We've had to dig in and shore up the slab's internal beams, which is nearly finished. We'll need probably another 8 cubes of fill, then 6 cubes of sand on top of that.

My low voltage conduit is actually 8 runs, some 63mm and some 100mm. All of them except for one had to run underneath the slab's internal beams, which meant digging them 600mm below finished height.


You do not have the required permissions to view the files attached to this post.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Report this post
Top
 Profile  
 
 Post subject: Slab pour!
PostPosted: Mon Mar 01, 2010 10:36 pm 
Offline
User avatar

Joined: Fri Jan 13, 2006 11:02 am
Posts: 107
Location: Gold Coast, Australia
After lots more earthmoving & compacting, the slab has finally been poured.


You do not have the required permissions to view the files attached to this post.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Report this post
Top
 Profile  
 
PostPosted: Wed Mar 03, 2010 11:37 am 
Offline
Senior Member
User avatar

Joined: Thu Jan 04, 2007 6:37 pm
Posts: 882
Location: Regional Victoria, Aus
Is that you in the welly's?
Very mardi Gras :mrgreen:

_________________
inkspotproductions
www.bantamstudio.info


Report this post
Top
 Profile  
 
PostPosted: Wed Mar 03, 2010 5:46 pm 
Offline
Site Admin
User avatar

Joined: Mon Jan 27, 2003 12:46 pm
Posts: 5317
Location: Australia
lilith_envy wrote:
Is that you in the welly's?
Very mardi Gras :mrgreen:


:thu: - at least he's sober which is more than you can say about your pics :)


Report this post
Top
 Profile  
 
PostPosted: Thu Mar 04, 2010 1:11 pm 
Offline
User avatar

Joined: Fri Jan 13, 2006 11:02 am
Posts: 107
Location: Gold Coast, Australia
Haha I hadn't looked very closely at that pic until now, it certainly is a bit YMCA!

No that's not me, that's Joe the concreter/rapper who I've done a bit of recording for. He worked like a madman that day, especially considering the heat & humidity.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Report this post
Top
 Profile  
 
 Post subject: Concrete blocks
PostPosted: Mon Mar 22, 2010 12:31 pm 
Offline
User avatar

Joined: Fri Jan 13, 2006 11:02 am
Posts: 107
Location: Gold Coast, Australia
Started on the concrete block outer shell walls on the weekend. It's nice to be out of the dirt! We're using dry-stack blocks, so they go up pretty quickly after the first course.


You do not have the required permissions to view the files attached to this post.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Report this post
Top
 Profile  
 
PostPosted: Tue Mar 23, 2010 8:19 am 
Offline
Senior Member
User avatar

Joined: Thu Jan 04, 2007 6:37 pm
Posts: 882
Location: Regional Victoria, Aus
Hey John, I'd never operate power tools under the influence! :oops:

_________________
inkspotproductions
www.bantamstudio.info


Report this post
Top
 Profile  
 
PostPosted: Tue Apr 06, 2010 9:18 pm 
Offline
User avatar

Joined: Fri Jan 13, 2006 11:02 am
Posts: 107
Location: Gold Coast, Australia
How can you afford beer while you're building a studio anyway?!?

More progress over Easter. 1600 blocks laid, 900 to go. We're core-filling those on thursday to lock them in before proceeding further up into the sky.


You do not have the required permissions to view the files attached to this post.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Report this post
Top
 Profile  
 
PostPosted: Thu Apr 08, 2010 8:29 pm 
Offline
User avatar

Joined: Fri Jan 13, 2006 11:02 am
Posts: 107
Location: Gold Coast, Australia
17 cubic metres of core fill went in without any dramas. There's about another 11 cubes to go :shock:


You do not have the required permissions to view the files attached to this post.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Report this post
Top
 Profile  
 
PostPosted: Tue May 04, 2010 9:01 am 
Offline
User avatar

Joined: Fri Jan 13, 2006 11:02 am
Posts: 107
Location: Gold Coast, Australia
We've put a lot more blocks up over the last 2 weekends, here's another sped-up video because I can't help myself.

Attachment:
Walls_700.JPG


You do not have the required permissions to view the files attached to this post.

_________________
Adam
Clarence Drive Film & Sound Studio | My Brisbane & Gold Coast Wedding Band


Report this post
Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 45 posts ]  Go to page 1, 2, 3  Next

All times are UTC + 10 hours


Who is online

Users browsing this forum: Bing [Bot], Exabot [Bot], Google [Bot] and 3 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
Powered by phpBB® Forum Software © phpBB Group